How Gorpelta builds
Good ground.
Good practice.
We build around the yard you have. Paths, gates, tree roots and the way rain leaves the ground all belong in the first conversation.
From the back gate to the first putt.
-
Walk the site.
We measure the area, check gate access and discuss where rainwater can go. We look at space around the green and agree on the cups, breaks and edging. Any needed utility locating happens before digging.
-
Make the base firm.
Grass, roots and soft soil come out. We shape the ground, add crushed stone in thin layers and compact each layer. The required depth depends on the soil; adding more turf will not fix a soft base.
-
Give water a way out.
A gentle fall carries water through and away from the base. Where needed, a buried drain leads to an agreed outlet on your property. We do not send runoff toward a foundation or a neighboring yard.
-
Fit, test, hand over.
We fit the turf, join seams, secure edges and set the cups. Then we roll putts with you and walk through brushing, debris removal and drain checks.
A build date comes after the plan.
Our Maple Crossing site visits run by appointment, Monday–Friday, 8am–4pm. We confirm the scope and written total before scheduling. Wet or frozen ground can move a build date.
Stay in touch about the work.
If an edge lifts or a seam needs attention, tell us so we can inspect our workmanship and discuss the next step. A green should come with clear care instructions, not a guessing game.
Let us walk it with you.
Bring a rough idea of where the green might go. We will check what the ground needs.