Seasonal work / New installations
A plan for both
ends of summer.
Starting prices help you plan. We visit the site and check water depth before any quote, including seasonal work. Length, lakebed, shore slope and access affect the final scope.
01 / The seasonal rhythm
In for spring.
Out for winter.
Dock-in runs April–May. Dock-out runs September–November, before ice. Weather, water and shore access set the workday; we agree on a time after the visit.
- Spring dock-in
-
From $480
Labor to place and level an existing sectional dock up to 40 feet, with connection checks. Existing parts must be sound; repairs are quoted separately.
- Fall dock-out
-
From $450
Labor to remove an existing sectional dock up to 40 feet and stack it at an agreed spot on your property. Hauling and off-site storage are separate.
- Seasonal lift move
-
From $325 each way
Placement or removal of an existing freestanding boat lift. Boat removal, electrical work and repairs are separate.
- Winter storage
-
From $650 / season
Outdoor yard storage for up to 40 feet of dock sections and one freestanding lift, November–April. Hauling starts at $250 each way; boat storage is not included.
02 / A new place at the water
A dock or lift
that fits the site.
Ranges include the equipment, standard installation labor and setup checks described here. Shore work, electrical connections, hauling old equipment and town fees are separate if needed.
- New sectional dock
-
$6,000–$12,000 installed
A 32- to 40-foot straight dock with decking, support legs and a shore connection. Layout and lakebed conditions determine the final plan.
- New freestanding boat lift
-
$7,500–$15,000 installed
A manual lift sized for a typical small runabout, with placement and boat-fit checks. A canopy or powered lift changes the scope and is quoted separately.
We check the boat’s loaded weight and dimensions before selecting a lift. No equipment is ordered until the layout and written price are agreed.
03 / Before a date goes on the calendar
A few shore
questions.
What may the town or lake association ask for?
They may ask for a site sketch, dock dimensions, setbacks, or a proposed layout. Bring any written requirements to the visit. We file the paperwork when your town asks for it. Town fees and any review timing are discussed before work is scheduled.
Can you quote from a photo?
A photo helps us prepare, but we visit the site and check water depth before any quote. We also need to see the access route and the condition of existing equipment.
Is it too late for a fall removal?
In November 2026 we assess each removal against open water, weather and access. We confirm whether the work can be done before setting a date; a form request does not reserve a crew.
A better plan starts at the edge.
Tell us about your dock, lift or the shore you are starting with.