Our approach

The parking spot
sets the plan.

Zeqtaro Electric focuses on home charging. We start with how you use your garage or driveway, then work back toward the panel.

Walk the route.

At the $125 panel check we look at the proposed mounting spot, cable distance and panel capacity. We talk through garage storage, door openings and outdoor access.

Put it in writing.

The quote separates the install from the charger, permit fees and any panel, post or trench work. You can read the scope before choosing a date.

Leave a usable space.

We explain the finished cable route and charger controls, collect our offcuts and leave the work area tidy. If something about our workmanship needs attention, tell us so we can look at it.

November planning: garage visits continue Monday–Friday, 8am–5pm. Outdoor routes may need to wait for a clear work area or thawed ground. A request is the start of a conversation about timing.

Read the installation ranges

A place to plug in

Start at the panel.

A panel check comes before an install quote. We look at the available capacity, the cable route and where you park.

Plan my charger install