Planning prices / November 2026

Follow the route.
Understand the price.

These sample ranges cover labor, cable and surface-mounted routing for one customer-supplied wall charger, with suitable capacity already available at the panel.

Panel to parking spot

Measure along the likely cable path, including turns and the rise up a wall, rather than straight across the floor.

ROUTE 01

Up to 15 feet

$850–$1,250

A nearby garage wall with an accessible route.

ROUTE 02

16–40 feet

$1,250–$1,900

A longer run along a garage or basement wall.

ROUTE 03

41–75 feet

$1,900–$2,800

More cable and routing time between panel and charger.

The charger, panel changes, permit fees, wall repairs, trenching and freestanding posts are not included. Routes over 75 feet and concealed cable runs need a separate quote. No price is confirmed before the panel check.

Panel check

$125 / visit

We review the panel, the capacity available and your proposed charger location. You get a written next step, including any panel work to price separately. This visit is charged separately and is not deducted from an install.

Garage or outdoor wall?

We consider the mounting surface and where the charging cable will rest. A post, a trench or a difficult wall changes the scope; we price those items before you agree to work.

A little paperwork first.

Your utility may ask for charger details or a review of the electrical service. Your town may ask for an application and a visit after installation; we pull the permit when your town asks for one. Ask your utility about programs.

Before we agree on a time

Can you install in winter?

Garage installations can be scheduled through winter after the panel check. Outdoor wall work depends on access and weather; trenching waits if the ground is frozen. We agree on a new date when snow or ice changes the plan.

Should I buy a charger first?

You can bring a charger choice to the visit, or wait until the panel and route have been checked. The installation ranges do not include the charger itself.

A place to plug in

Start at the panel.

A panel check comes before an install quote. We look at the available capacity, the cable route and where you park.

Plan my charger install